Skip to main content
Rent or purchase exhibition stands – flexible, modular, and reusable.

Are you interested in our exhibition systems or planning your next trade show appearance? Then don’t hesitate to get in touch with us:
E-Mail: hello@ayble.de
Tel: +49(0) 40 / 609 40 75 35

Book a showroom appointment here

-> Book a showroom appointment here

ayble GmbH WhatsApp WhatsApp:
+49(0) 40 609 40 75 38

Personal consultation Showroom appointment Whatsapp

Power on your exhibition stand: what to order, and by when

By Malte Heidmann, ayble — as of October 2026

In short

  • Power is ordered from the fair organiser; their service partner does the installation.
  • Order by connected load, not by socket count: add up every device and add about 10 per cent reserve.
  • Messe Frankfurt’s deadline is 22 days before the fair opens. Later orders carry a 25 per cent express surcharge.
  • Coffee machines, fridges and kettles draw by far the most — more than lighting and laptops together.
  • Internet usually runs through the organiser, who may exclude outside providers, and has its own deadline.
  • The cable-route plan matters: the hall floor connection decides where your equipment can stand.

If your company is based outside Germany, this is the part of a German fair that is easiest to underestimate. Power is not something you plug in on build-up day. It is ordered weeks in advance, installed by a contractor you do not choose, and billed by connected load.

Overview: what to clarify, and when

Topic What to clarify When
Power connection Connected load in kW, number of connections, continuous or daily power With the technical order, no later than the organiser’s deadline
Distribution on the stand Sockets, distribution boards, where the hall connection sits After you have the floor area, before planning equipment
Lighting Total wattage of all luminaires, continuous or timer operation During stand planning
Internet / Wi-Fi Bandwidth, number of access points, ordering route via the organiser With the technical order
Water / compressed air Only if needed, e.g. a coffee bar or a machine demo With the technical order
Inspection Sign-off by the service partner before anything runs On build-up day

Deadlines and prices are set by each organiser. The figures below come from Messe Frankfurt and Hamburg Messe documents as examples; your fair’s technical guidelines are what binds you.

1. How much power do you actually need?

Add up the wattage of every device, add about 10 per cent reserve, then order the next higher connection value.

A worked example: four lamps at 227 W each, a 1,500 W coffee machine and an 800 W fridge come to about 3,200 W. With reserve, about 3,500 W. You order 4 to 6 kW.

Reference values: coffee machine around 1.5 kW, kettle 1 kW, fridge 0.8 kW. Laptops, chargers and screens are not in that example. Check the rating plate of your own equipment, because yours may differ.

LED frames draw little — the ayble datasheet says a household connection is enough, with the exact draw depending on size. You still report the total wattage to the organiser.

The question to ask: “What is the total load of everything on our stand, reserve included?”

2. Who is allowed to connect it?

The technical guidelines decide. At Hamburg Messe, only the fair’s own service partners may carry out electrical installation.

You order the capacity; the service partner installs the connection. Not you, and not your stand builder. Work inside the stand — plugging in lights, connecting a display — is governed separately by each fair’s rules.

The reason is safety in the hall: a faulty connection does not stop at your stand boundary.

The question to ask: “Which electrical work may our stand builder do, and which only the service partner?”

3. Deadlines, surcharges and the technical order

Orders go through the organiser’s service portal.

Messe Frankfurt: order at least 22 days before the fair opens. After that, a 25 per cent express surcharge applies, and from five days before the opening, timely delivery can no longer be guaranteed. Hamburg Messe also charges surcharges for late orders.

A practical tip: put the technical order on the same date as the artwork deadline. Two deadlines on one calendar entry get missed less often than two scattered ones.

The question to ask: “What is the last date without a surcharge, and who on the team owns it?”

4. Internet, Wi-Fi and water

Many fairs allow internet only through the organiser. Hamburg Messe supplies its own provider connection and expressly excludes external providers — so bringing your own router from home is not a plan.

Order bandwidth and the number of access points, ideally together with the power. Water and compressed air are ordered only if you genuinely need them, with the same lead time.

Connections usually sit in floor ducts or floor connection units; the stand plan shows where.

The question to ask: “Do we need live data or cloud applications, and does the ordered bandwidth cover them?”

5. Equipment in a modular stand: where the cables go

The stand plan shows the hall floor connection. Check it before you fix the position of the counter or the screen.

In a frame system, counters and monitor frames are easy to move, because assembly is tool-free. Monitors mount to VESA 400 × 400, and each frame carries about 30 kg.

Classic custom stand building solves cabling with cutouts and channels in the furniture. That works well, but the position has to be fixed earlier, because changes cost carpenter hours.

The question to ask: “Where is the hall connection, and where should the equipment therefore stand?”

A worked example: coffee bar and video wall

A mid-sized exhibitor plans a 24 m² stand with a counter, a coffee machine, a large monitor and eight lit frames.

Four months ahead the team lists the devices, lands just over 3 kW, adds reserve and orders about 4 kW plus internet for a demo tablet. The order goes out four weeks before the fair, comfortably inside the deadline.

On build-up day the hall connection turns out to be at the rear left, while the coffee bar was planned front right. The modular counter moves to the other side in minutes. A late reorder would have cost considerably more.

Common mistakes

  • Estimating the connected load instead of adding it up device by device, with reserve.
  • Missing the order deadline and paying the express surcharge.
  • Forgetting the coffee machine — often the single largest consumer on the stand.
  • Bringing your own Wi-Fi equipment although the organiser excludes outside providers.
  • Ignoring the stand plan and placing equipment where there is no connection.
  • Running your own extension leads and power strips without checking the technical guidelines.

Frequently asked questions

How much power does an exhibition stand need?

Add up all loads and add about 10 per cent reserve. Small stands with lighting and a monitor often need only a few kW; a coffee machine and a fridge raise the figure considerably.

Who installs the power?

Usually the organiser’s service partner. At Hamburg Messe, only its partners may carry out electrical installation.

By when do I have to order?

Each organiser sets its own deadline. Messe Frankfurt: at least 22 days before the opening, after which a 25 per cent express surcharge applies.

May I run my own Wi-Fi?

That is governed by the technical guidelines. Hamburg Messe supplies internet through its own provider connection and excludes external providers.

Is a normal socket enough for LED frames?

According to the ayble datasheet, yes — a household connection suffices, with the exact draw depending on size. You still report the total wattage to the organiser.

What does power cost?

It varies by organiser and connected load, is billed separately, and is more expensive than electricity in an office. Prices are in each fair’s service portal.

Conclusion

Sort the power out well before build-up day: list the devices, calculate the connected load with reserve, and put the deadline in the project plan. This applies to modular and custom stands alike. Check every figure here against your own fair’s technical guidelines, because they differ from organiser to organiser.